Commissioning & testing

A plant is not finished until it has been measured and documented. We test to DIN EN 62446-1, expose faults before they cost yield, and hand over a test report to DIN EN 62446-1 of the kind banks, insurers and buyers expect.

Built does not mean tested

Many plants go on the grid without anyone measuring them string by string. Reversed connectors, failed bypass diodes or micro-cracks go unnoticed and cost yield for years. Without documentation, warranty claims, insurance and resale become difficult.

Measure, compare, document

We test every string electrically and measure open-circuit voltage, insulation resistance and short-circuit current. I-V curve measurement compares module behaviour with manufacturer data. Thermography reveals hot spots and connection faults that the measurement log does not show. All results feed into a test report to DIN EN 62446-1.

Thermography and I-V curve measurement on a string

Your benefits

  • Test report to DIN EN 62446-1

    Evidence of proper installation, as network operators, banks and insurers expect it.

  • Thermography

    Hot spots, defective cells and loose connections become visible before they cost yield.

  • I-V curve measurement

    Deviations from manufacturer data are detected at string level.

  • Grid connection supported

    We coordinate energisation with the network operator and make sure the required notifications are filed.

  • Monitoring from day one

    Data logger and portal are set up and checked against the measured values.

  • Testing independent of the installer

    We also test plants we did not build, before purchase or takeover.

Process

  1. Visual inspection

    Check of installation, cabling, labelling and protective devices.

  2. Electrical measurement

    Open-circuit voltage, short-circuit current, insulation and earthing resistance per string.

  3. I-V curve and thermography

    Performance verification at string level and imaging of the module fields under load.

  4. Energisation

    Coordination with the network operator, meter installation and monitoring set-up.

  5. Test report and handover

    Report to DIN EN 62446-1 and plant documentation.

Related projects

Your contact

Dieter Testname

Contact, Commissioning and Testing

+49 000 0000 104

dieter-testname@example.invalid

Enquiry

Fields marked * are required.

Your role
Existing plant
Services